- Basic Engineering for whole Plant
- Supervision of Construction
- Detail Engineering for Cryogenic Storage Tanks including Detail Design of Piles
- Procurement / Delivery of main equipment
- Operator Training
- Performance Tests
- Pre-Commissioning & Commissioning
- Each storage tank contains of two send-out pumps to cracker with one future send-out pump and one future ship loading pump
- Three propane liquefaction systems
- Three ethane liquefaction systems
- Ship unloading system 2,000 t/h with two ship unloading/loading arms 12” each and 28” unloading line