- Preliminary Design
- Storage tank pile test scheme
- Terminal foundation treatment scheme
- Scope of work and technical requirements in EPC ITB
- HAZOP, SIL
Preliminary design for whole LNG Terminal with a turnover capacity of 5 MTPA with 5 x 200,000 m³ LNG tanks and one jetty to berth 80,000 m³ ~270,000 m³ LNG ships in Phase I and consider to reach turnover capacity of 10 MTPA in Phase II.