EPC of the third tank project (one additional 180.000m³ storage tank) as part of the expansion project of the LNG Terminal in Świnoujście in an integrated consortium:
- Basic and Detail Design LNG storage tank, pumps, interconnecting piping and Boil off gas treatment
- Procurement of all equipment incl. all mechanical equipment, electrical + instrumentation, safety
- Procurement of al material incl. special cryogenic material
- Construction of the storage tank within battery limits
- Installation of all equipment incl. in-tank pumps and BOG compressors
All Site supervision, construction, commissioning and start-up activities.