Project Description

This survey was requested by client as some non-conformities with the insulation system were identified. Therefore, the focus was to understand how the insulation of the tank (by others) was designed and executed. Delivery of a root cause analysis and repair recommendation based on.

  • Delivery of a root cause analysis and repair recommendation based on
  • Piping and structural steel
  • Review of existing documents
  • Visual inspection of tank slab and roof


Project Highlights

15,000 MT

Storage Capacity

API620

Design Code

Full Containment (Steel/Steel)

Tank Type

Ammonia

Product

Location

Samsun, Turkey

Owner

Toros Tarim Sanayi Ve Tricaret A. S.

Contractor


TGE

Year of Completion

2021

Contract Scope

E