- Cascade boil-off gas reliquefaction system with propylene cycle, with two stage oil free reciprocating compressor for ethylene and skid mounted screw compressor system for propylene as refrigerant.
- 300 m3/h ship unloading and 200 m3/h ship loading system with 4,300 m ship unloading/loading line
- Two send out in-tank pumps and one future ship loading in-tank pump
- Send out system (27 t/h) with two ethylene evaporator
- Condensation of chlorine vapours (40 t/h) against evaporating ethylene and sent out of chlorine liquid to downstream plant
- Basic Design
- Detail Design of Ethylene Storage Tank
- Procurement / Delivery of main equipment
- Operator Training
- Supervision of Construction
- Performance Tests
- Pre-Commissioning & Commissioning