- Ethane storage tank and process area to supply ethane to cracker
- Tank: PUF Bottom and wall insulation system, 3 in-tank pumps
- Process area: 2 x 50% BOG compressor skids (screw type), 2 x BOG gas / gas preheater, Ground Flare (2.0 t/h)
- Basic Engineering
- Detail Engineering
- Front-End-Engineering-Documentation
- Procurement / Construction
- Pre-commissioning, Commissioning and Performance Tests