Location:
Qi Dong City, Jiangsu Provice, P.R. China
Owner:
Guanghui Energy Co- Ltd
Contractor:
TGE / YPDI
Year of Completion:
2020
Contract Scope:
EPC
Basic and detailed Engeineering
Fabrication and Delivery
Supervision
Procurement
Construction
Commissioning
Storage Capacity:
160,000 m3
Terminal Capacity:
3 MTPA
Tank Type:
Full containment
Design Code:
EN 14620
EPC of 160,000 m3 LNG Storage Tank
In-situ bored pils with elevated slab
Outer tank facilities and pipe rack from tank to main terminal pipe rack
Please note, that some of the documents are in PDF format and require Adobe Reader.