Hammerfest, Norway
Location:
Melkøya Island Hammerfest, Norway
Owner:
Snøhvit License Group, Norway
Contractor:
Consortium TGE – Entrepose – Fabricom
Year of comploetion:
2006
Contract Scope:
EPC
Basic Engineering
Authority Engineering
Construction
Procurement
Detail Engineering
Comissioning
Storage Capacity:
2 x 125,000 m³
Tank Type:
Full containment
Design Code:
BS 7777 / EN 1473
The project involves the design, engineering, supply, pre-fabrication, installation/ construction and commissioning/ start-up of Storage and Loading Package for LNG, LPG and Condensate (Export Terminal).
The LNG export capacity is designed for 5.6 billion m³ / year.
The project includes 2 LNG storage tanks full-containment type of each 125,000 m³ net capacity, 1 LPG storage tank of 45,000 m³ net capacity and 1 condensate storage tank of 75,000 m³ plus loading facilities for vessels of up to 160,000 m³.