Choose your language

02180 // Ethylene / Propylene Terminal | Ningbo, P.R. China

Ningbo, P.R. China

Ethylene / Propylene including 1 x 20,000 m³ + 1 x 30,000 m³ Tanks

Contract Data

Location:

Ningbo, P.R. China

Owner:

SINOPEC Zhenhai Refining & Chemical Company

Contractor:

TGE

Year of Completion:

2010

Contract Scope:

EP+CS

TGE Scope of Work

Basic Engineering

Storage Tank Detail Design

Procurement / Delivery of main equipment

Supervision of Detail Engineering, Construction, Pre-commissioning, Commissioning, Performance Tests

Operator Training

Storage Tank Data

Storage Capacity:

1 x 30,000 Ethylene / 1 x 20,000 m³ Propylene

Tank Type:

Single Containment

Design Code:

API 620

Project Description / Highlights

Ship unloading/loading system with 8 km long ship loading/unloading line

Ethylene / Propylene receiving system from cracker / Ethylene / Propylene high pressure pump system

Ethylene vapour sent out system (150 t/h) to down-stream plants / Ethylene BOG handling system

Propylene (heated) send- out system (75 t/h) to down-stream plants

Propylene BOG handling system

DOWNLOADS

Please note, that some of the documents are in PDF format and require Adobe Reader.

CODE OF CONDUCT