Stenungsund, Sweden
Location:
Stenungsund, Sweden
Owner:
Borealis Polymers N.V., Belgium
Contractor:
Year of Completion:
2016
Contract Scope:
EPC
Basic Engineering
Detail Engineering
Front-End-Engineering-Documentation
Procurement / Construction
Pre-commissioning, Commissioning and Performance Tests
Storage Capacity:
52,000 m³
Tank Type:
Full Containment
Design Code:
EN 14620
Ethane storage tank and process area to supply ethane to cracker
Tank: PUF Bottom and wall insulation system, 3 in-tank pumps
Process area: 2 x 50% BOG compressor skids (screw type), 2 x BOG gas / gas preheater, Ground Flare (2.0 t/h)