Mailiao, Taiwan
Location:
Mailiao, Taiwan
Owner:
Formosa Petrochemical Corporation
Contractor:
Year of Completion:
1998
Contract Scope:
EPC
Complete Basic and Detail Design
Pre-commissioning and Commissioning
EPC turn-key erection
Operator Training
Soil improvement design and supervision
Warranty Execution
Performance Tests
Storage Capacity:
2 x 30,000 m³
Tank Type:
Double Containment
Design Code:
API 620
Terminal Project together with TGE Job 872A completed in 1998
Jetty Ship unloading/loading system
Ammonia in-tank pumps (prototype development by Ebara/TGE)
Ammonia blow down and flare system
Ammonia BOG handling system