Yantai, Shangdong Province, P.R. China
Location:
Yantai, Shangdong Province, P.R. China
Owner:
Poly-GCL Pan-Asia International Energy (Shangdong) Co., Ltd.
Contractor:
TGE / CET Consortium
Year of Completion:
2020
Contract Scope:
E
Preliminary Design
Storage tank pile test scheme
Terminal foundation treatment scheme
Scope of work and technical requirements in EPC ITB
HAZOP, SIL
Storage Capacity:
5 x 200,000 m³
Terminal Capacity:
5 MTPA
Tank Type:
Concrete / Steel Full Containment
Design Code:
EN 14620
Preliminary design for whole LNG Terminal with a turnover capacity of 5 MTPA with 5 x 200,000 m³ LNG tanks and one jetty to berth 80,000 m³ ~270,000 m³ LNG ships in Phase I and consider to reach turnover capacity of 10 MTPA in Phase II