Zhangzhou, P.R. China
Location:
Zhangzhou (Province Fujian), P.R. China
Owner:
CNOOC FUJIAN LNG CO. LTD.
Contractor:
TGE
Year of comploetion:
2014
Contract Scope:
FEED
Front End Engineering Design (FEED)
Value Improvement Studies
EPC Project Time Schedule
Tank Design Study including 220,000 m³ Option in Seismic Active Zone
Lump Sum Turn-Key Cost Estimate
Provision of Tender Documentation in 2 Parts, Storage Tanks and Terminal Area
Storage Capacity:
4 x 160,000 m³
Terminal Capacity:
6 MTPA
Tank Type:
Full Containment
Design Code:
EN 14620
LNG Receiving Terminal:
Provision for usage of cold energy
Marine docking facilities with single berth capable of mooring and unloading LNG carriers in the class 80,000 m³ to 270,000 m³ and loading carriers in the class 30,000 m³ to 80,000 m³
Send-out to trunk line (NG), trucks (LNG) and ships (LNG), 6 mtpa in average